Tronjori Women High Waist Casual Wide Leg Long Palazzo Pants Trousers Regular Size

Tronjori Women High Waist Casual Wide Leg Long Palazzo Pants Trousers Regular Size

$ 36.00

$ 36.00

Save: $

Color:
  • Black
  • Black White Short
  • Camel
  • Multi Check Short
  • Navy
  • Brown
  • Fiery Red
  • Ivory White
  • Beige Short
  • Chocolate
  • Dark Gray
  • Mocha
  • Taupe
  • Blue Gray
  • Dark Red
  • Olive
  • Charcoal Gray
  • Grape Purple
  • Green
  • Khaki
  • Lilac
  • Mustard Yellow
  • Rose Tan
  • White Dot
  • Sand
  • White Check
  • Blue
  • Green Snake Skin
Size:
  • X-Small Short
  • X-Small Long
  • X-Small
  • Small
  • Small Long
  • Small Short
  • Medium
  • Medium Long
  • Medium Short
  • Large
  • Large Short
  • X-Large
  • X-Large Short
  • XX-Large
  • XX-Large Long
  • XX-Large Short
  • 1X
  • 2X
Unavailable
Please select combo product attributes
The combo subtotal is $,SAVE$

Product Details



    • Flowy,Comfy Fabric in Medium Weight much Heavier than Normal Chiffon,Antistatic.
    • Fashion Vintage HIGH WAIST Culottes Loose Wide Leg Flattering Pants,Zip Closure with Hook and Eye,Back Elastic Real Waistband with Belt Loops,Front Pleats ,Back Darts,Side Slant Pockets
    • LengthMost of them are Regular length .They will be short for you if you are taller than 6' or you have longer legs than normal.They will be too long for you if you are shorter than 5'2" and you're not willing to wear high heels or you are not able to hem them.For your Reference,Our Model:Height 5'10" with longer legs.You will find Petite sizes in some colorways.
    • WaistSIZE XS NATURAL WAIST=26 3/8",SIZE S NATURAL WAIST=28 1/3", SIZE M NATURAL WAIST=30 1/3",SIZE L NATURAL WAIST=32 1/3",SIZE XL NATURAL WAIST=34 1/4",SIZE XXL NATURAL WAIST=36 1/4" SIZE XXXL(1X) NATURAL WAIST=39"SIZE 2X NATURAL WAIST=43" INSEAM LENGTH 27 1/2 OUTLENGTH 40 1/2"--42 1/2Please measure your natural waist @bellybutton and CHOOSE THE CLOSEST SIZE.Only Size 1X and 2X are Plus sizes.
    • Please DO NOT choose size just as per your experience.Please follow our waist measurement and measure your waist to match .Normal Machine Wash with Like Colors.Do Not Tumble Dry.

    You May Also Like

    Boys Vest Leather Western Cowboy Dress Vests with Pockets Vintage Suede V Neck Formal Wedding Waistcoat
    Boys Vest Leather Western Cowboy Dress Vests with Pockets Vintage Suede V Neck Formal Wedding Waistcoat

    $ 29.00

    Anya Oversized Coat - Charcoal
    Anya Oversized Coat - Charcoal

    $ 62.42

    $ 81.15

    Womens Capri Pants Dressy Business Casual Dress Pants High Waisted Wide Leg Capris Summer Work Trousers with Pockets
    Womens Capri Pants Dressy Business Casual Dress Pants High Waisted Wide Leg Capris Summer Work Trousers with Pockets

    $ 50.00

    GUESS Women's Alexia Sequins Tank Top
    GUESS Women's Alexia Sequins Tank Top

    $ 41.00

    Motorcycle Racing Pattern Women's Mini Tennis Skirt with Shorts Underneath Athletic Workout Cute Skorts
    Motorcycle Racing Pattern Women's Mini Tennis Skirt with Shorts Underneath Athletic Workout Cute Skorts

    $ 35.00

    Cinch Men's Brown & Black Aztec Print Reversible Vest MWV1910001
    Cinch Men's Brown & Black Aztec Print Reversible Vest MWV1910001

    $ 67.64

    $ 87.93

    MINTLIMIT Women's Denim Vest Sleeveless V Neck Button Down Jean Waistcoat Y2K Denim Jacket Country Trendy Outfits
    MINTLIMIT Women's Denim Vest Sleeveless V Neck Button Down Jean Waistcoat Y2K Denim Jacket Country Trendy Outfits

    $ 34.00

    Maacie Maternity Shorts Underbelly Drawstring Elastic Waist Cotton Shorts with Pockets Summer Cute Beach Casual Shorts
    Maacie Maternity Shorts Underbelly Drawstring Elastic Waist Cotton Shorts with Pockets Summer Cute Beach Casual Shorts

    $ 33.00

    Thatrich Womens Winter Snow Boots Ankle Booties Warm Fur Lined Waterproof Insulated Slip On Shoes Anti-Slip Outdoor Sneaker
    Thatrich Womens Winter Snow Boots Ankle Booties Warm Fur Lined Waterproof Insulated Slip On Shoes Anti-Slip Outdoor Sneaker

    $ 39.10

    $ 50.00

    Tank Top with Built in Bra for Women 2025 Summer Plus Size Scoop Neck Sleeveless Tee Basic Workout Top Camisole
    Tank Top with Built in Bra for Women 2025 Summer Plus Size Scoop Neck Sleeveless Tee Basic Workout Top Camisole

    $ 34.00

    $ 48.49

    +
    Cart
    +
    Style Meets Winter Functionality
    Your cart is currently empty.